š„āļø Heliport Design for the Buenaventura Hospital: A Strategic Project Led by Okicam
- Juan Correa
- Apr 28
- 2 min read
As part of the development of the new hospital in Buenaventura, Colombia, Okicam was commissioned to design a heliport that would not only comply with current aeronautical regulations but also optimize the hospitalās operational capacity.
From the outset, the project presented strategic challenges, which were addressed through a comprehensive technical approach. In addition to the structural requirements, a detailed analysis of the potential aircraft fleet was conducted, determining that the Black Hawk UH-60 helicopterādue to its operational capacity and prevalence in emergency missionsāshould serve as the primary reference for the heliportās design.

A multidisciplinary team of specialists in aeronautical design, helicopter operations, and structural civil engineering was assembled. Although the scope focused on the conceptual phase and the calculation of live and dead loads, every stage was executed under strict international standards of quality and safety.
In the absence of a specific national guide, the following reference standards were employed:
Heliport Manual (Doc 9261) ā ICAO
Annex 14, Volume II ā ICAO
Annex 14 RAC ā Colombian Civil Aviation Authority
FAA AC 150/5390-2C ā Heliport Design
NFPA 418 ā Standard for Heliports (NFPA, USA)
The conceptual design included the delineation of approach and departure surfaces, a 3D model of the heliport, and the definition of operational safety zones. Additionally, recognizing that the hospital is located in a residential area, a specialized acoustic modeling studyĀ was conducted to assess the environmental noise impact. This analysis ensured that heliport operations would be compatible with the surrounding urban environment and provided technical recommendations to minimize disturbances to the local community.


The project concluded with the delivery of a comprehensive technical report, covering structural aspects, environmental acoustic impact analysis, and emergency response plans for fire and fuel spill incidents, all coordinated with local emergency services.
The clientās full satisfaction confirmed the strength of the methodology applied and the quality of the services provided. This project stands as a testament to Okicamās commitment to integrating specialized knowledge, managing multidisciplinary teams, and delivering effective solutions in highly complex projects.